The Panj-Amu River Basin Programme (P-ARBP)

2009 - 2017

Natural resource management

The Panj-Amu River Basin Programme (P-ARBP) was an EU-funded initiative in Afghanistan supported by Landell Mills as main technical services provider between 2009 and 2017. Support was provided in cooperation with the Ministry of Energy and Water (MEW); Ministry of Agriculture, Irrigation and Livestock; and other government agencies.

Nahreen WUA

The overall objective of the project was to contribute to the improvement of rural livelihoods in a way that respected and protected the natural resource base, thereby contributing to the overall economic recovery of Afghanistan.

Specifically, the contract aimed to ensure that water resources in the country ‘are more economically and equitably managed and sustainably protected’. In April 2018, the programme won best International Development: Non-Physical Project at the British Expertise International Awards.

The economy in Afghanistan relies on agricultural production, and so access to irrigated water is essential. However, in the north east of the country, lack of efficient water management within the Panj-Amu River Basin meant that much of the water in the area was being wasted. In addition, factors such as climate change, a rapidly growing population and demand from hydropower all jeopardise the availability of water in the country.

The solution required an integrated approach to the management of water between different users, while at the same time improving the effectiveness and efficiency of water delivery infrastructure.

P-ARBP provided this by focusing on three key areas:

River basin management and planning
  • To support the reform of water management institutions from an administrative to a river basin approach, Landell Mills helped establish the first river basin agency (RBA) and sub-basin agencies (SBAs) in Afghanistan, as well as the supporting enabling environment such as the water law and procedures. These agencies are under the MEW structure but being at the local level are better able to respond to community needs. Landell Mills also built the capacity of RBA/SBA members to undertake river basin planning so that water is used equitably between upstream and downstream users. In 2011, Lower Kunduz and Taloqan sub-basins experienced a drought-induced water shortage. In order to avoid conflict between upstream and downstream users, the SBAs, with Landell Mills’ support, established water allocation teams to control and supervise the water distribution along both rivers. With these measures, serious conflicts were successfully avoided and the available water could be distributed according to the established rotations.
  • At basin level, climate change assessments were carried out on the basis of snow coverage studies in order to have better baseline data for water allocation and flood preparedness. This is of significant importance, as in Afghanistan there is a 30 year gap in data on water flow and climate.
Participatory irrigation rehabilitation and upgrading
  • Construction or rehabilitation of more than 750 versatile, irrigation structures (a capital investment of approximately EUR 50 million), that have helped farmers adapt to rapidly changing and highly dynamic flows in the river. Farm water saving techniques were also developed through participatory technology development techniques. The most promising and successful approach was the system for rice intensification (SRI) which was widely adopted by farmers across the project area. Principles included applying a minimum quantity of water, instead of continuous flooding, and the individual transplanting of very young seedlings in a square pattern to give plants more room for root and tiller growth. Landell Mills, in partnership with NGOs under the project, was one of the first organisations in Afghanistan to promote the technology. On 25 demonstration plots, yield increased by 22% with a substantial decrease in the amount of water used.
  • To ensure the activities of the RBAs and SBAs were undertaken in a participatory manner, almost 800,000 water users were organised into water user associations (WUAs). Representatives from these WUAs were able to advise and provide feedback to the agencies. Landell Mills set up and built the capacity of almost 100 WUAs to independently manage irrigation infrastructure, and to promote the equitable distribution of water between farmers. WUAs were involved from the outset in selecting works to be built or rehabilitated, approving designs which were prepared according to latest climate change projections, and assisting in construction supervision.
Upper catchment management
  • Coordination with village natural resource committees and catchment management associations to implement participatory projects. These projects aimed at protecting against flash floods, decreasing soil erosion and promoting better drought resilience for the population in the often remote and vulnerable upper catchments.
  • Projects included the regeneration and protection of over 120,000 ha of pastures, rangeland and degraded woodlands, through the establishment of over 1000 household based nurseries, all managed by women, and 650 anti-erosion devices.

As a result of the interventions carried out under P-ARBP, over 60,000 ha (56 irrigation schemes) have directly benefited from improved irrigation infrastructure, leading to an increase in irrigated cropped area by 27,000 ha. P-ARBP successfully provided an integrated approach to water management, whilst remaining respectful of the region’s natural resource base. By establishing and working alongside agencies and associations for water users, Landell Mills ensured that the programme’s key stakeholders played a significant role in rehabilitating and upgrading infrastructure in the basin, and in improving overall water management.

Consequently, water is now managed more equitably between upstream and downstream users, both along rivers and within schemes. Landell Mills also coordinated with village natural resource committees to implement numerous projects, which provide the area and population with better protection from hydrological hazards, alongside making them more resilient to drought.

In order to ensure sustainability, capacity building of stakeholders (including MEW, RBA, SBAs, WUAs, contractors and universities) was carried out throughout the programme, and a number of guidebooks and manuals were produced in the local language. This literature been adopted by MEW and documents are available for download on their website. Training was also provided to RBAs in other basins to share lessons learned and best practise.

Landell Mills and the EU produced a short film about the impact of P-ARBP, which you can watch here.

Next steps

As a result of the institutional structures that are now present in the Panj-Amu River Basin, in 2017 the Asian Development Bank (ADB) selected the basin as the target area for a new water resources project, to be implemented by the government with the support of ADB and EU financing. Landell Mills worked with the ADB and EU to design and establish the project, which is set to continue until 2022.

Related Articles

Visibility for Addressing Environmental and Climate Change challenges through Improved Forest Management in Jamaica

2019 - 2022

Visibility for Addressing Environmental and Climate Change challenges through Improved Forest Management in Jamaica (IFMJ) was a communication and visibility contract implemented by Landell Mills from 2019-2022. The aim of the project was to highlight the positive impact of EU development assistance for the Jamaican forestry sector.

Jamaica 5
Technical assistance for the monitoring, knowledge sharing and visibility of the regional programme ECOFAC 6

2017 - 2023

The ECOFAC 6 (Preserving Biodiversity and Fragile Ecosystems in Central Africa) programme supported sixteen protected areas, including eight priority conservation landscapes. It spanned Cameroon, Central African Republic, Chad, Democratic Republic of the Congo, Republic of the Congo, Gabon, and Sao Tome and Principe.

ECOFAC 1
The Zarafshon Integrated River Basin Project (ZIBP)

2016 - 2020

The Zarafshon River in Tajikistan flows for 300km due west from the Zarafshon glacier on the border with Kyrgyzstan (see map), down to the provincial town of Panjakent and beyond to the plains of Uzbekistan.

Picture2